No. |
Year |
Client |
Contractor |
Project |
Location |
Remarks |
| |
|
|
|
|
|
|
| 122 |
October 2009 - at Present |
PT. Total E&P Indonesia |
PT. Perdana Karya Perkasa |
-. NDT Servicess (RT, MT, UT and WI) for Conductor Pipe (Welding and Coald Cutting Services) periode 2009-2010 |
CPA Field |
Inprogress Job (Estimated 2 Year) |
| 121 |
September 2009 - at Present |
PT. Total E&P Indonesia |
PT. Kaliraya Sari |
-. NDT Servicess (RT, MT, PT, UT) for TATUN Well Connection 2009-2010 (Package#B)/Phase 13-A |
Tatun Area |
Inprogress Job (Estimated 1 Year) |
| 120 |
May 2009 - at Present |
PT. Total E&P Indonesia |
PT. Citra Panji Manunggal |
-. NDT Servicess (RT, MT, PT, UT) for TUNU Well Connection Package-A Project |
Tunu Field |
Inprogress Job (Estimated 1 Year) |
| 119 |
March up to December 2009 |
PT. Total E&P Indonesia |
PT. Perdana Karya Perkasa |
-. NDT Servicess (RT, MT, PT and UT) for Various MRS at Handil |
CPA Field |
Completed Job |
| 118 |
September to November 2008 |
PT. Total E&P Indonesia |
PT. Nisconi |
-. NDT Servicess (RT, MT, PT, UT) for Hook-Up Peciko Field Development Phase V / EPSC1 - DD Project |
Peciko Field |
Completed Job |
| 117 |
July 2008 up to December 2009 |
PT. Total E&P Indonesia |
PT. Kaliraya Sari |
-. NDT Servicess (X-ray Crawler, RT, MT, PT and UT) for Pipeline Handil-Senipah Oil 20" MOL Replacement 16.6 Km) |
Handil - Senipah |
Completed Job |
| 116 |
June 2008 up to July 2009 |
PT. Total E&P Indonesia |
PT. Perdana Karya Perkasa |
-. NDT Servicess (RT, MT, PT and UT) for Well Connection periode 2008-2009 |
CPA Field |
Completed Job |
| 115 |
June 2008 up to November 2009 |
PT. Total E&P Indonesia |
PT. Paratech Gawi Manuntung - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Peciko VI/EPSC-3 off-shore Modification |
Peciko Field |
Completed Job |
| 114 |
April 2008 up to July 2009 |
PT. Total E&P Indonesia |
PT. NISCONI |
-. NDT Servicess (RT, MT, PT and UT) for Bekapai BG Platform and Well Connections |
Bekapai Field |
Completed Job |
| 113 |
March 2008 up to April 2009 |
PT. Total E&P Indonesia |
PT. Paratech Gawi Manuntung - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Desander Supply and Installation Servicess at Handil Area (Periode 2008) |
Handil Field |
Completed Job |
| 112 |
March 2008 up to May 2009 |
PT. Total E&P Indonesia |
PT. Paratech Gawi Manuntung - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Tatun Well Connection (4 wells) |
Tatun Area |
Completed Job |
| 111 |
January to October 2008 |
PT. Dimas Utama |
PT. Dimas Utama |
-. NDT Servicess (RT, MT, PT and UT) for Four ( 4 ) unit Fabrication and Erection of Test Barge |
TOTAL Area |
Completed Job |
| 110 |
January 2008 up to - September 2009 |
PT. Total E&P Indonesia |
PT. Bukaka Tehnik Utama- |
-. NDT Servicess (RT, MT and PT) for Conductor Pipe Periode 2007 - 2009 |
TOTAL Area |
Completed Job |
| 109 |
October 2007 - at Present |
PT. Total E&P Indonesia |
PT. NISCONI |
-. NDT Servicess (RT, MT, PT and UT) for Peciko Well Connection in 2007-2009 |
Peciko |
Inprogress Job (Estimated 2 Year) |
| 108 |
June 2007 up to February 2008 |
PT. Dimas Utama |
PT. ASTINAPUTERA EKAPERKASA |
-. NDT Servicess (RT, MT, PT and UT) for Fabrication and Erection of 4 Units Test Barge |
Tunu/Tambora Field |
Inprogress Job (Estimated 2 Year) |
| 107 |
May to December 2007 |
PT. Total E&P Indonesia |
PT. Citra Panji Manunggal - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Automatic Valve Installation on Condensate Line |
TOTAL Area |
Completed Job |
| 106 |
May 2007 up to February 2008 |
PT. Total E&P Indonesia |
PT. Paratech Gawi Manuntung - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Desander Supply and Installation Servicess at Handil Area (Periode 2007) |
Handil Field |
Completed Job |
| 105 |
April 2007 at present |
PT. Total E&P Indonesia |
PT. ASTINAPUTERA EKAPERKASA |
-. NDT Servicess (RT, MT, PT and UT) for Tunu-Tambora Well Connections (Package#1) 2007 - 2008 |
Tunu/Tambora Field |
Completed Job |
| 104 |
April up to October 2007 |
PT. Total E&P Indonesia |
PT. PERDANA KARYA Handil |
-. NDT Servicess (RT, MT, PT and UT) for New Installation Telcom Facilities at Bekapai P/F |
Bekapai Field |
Completed Job |
| 103 |
April 2007 up to July 2008 |
PT. Total E&P Indonesia |
PT. NISCONI |
-. NDT Servicess (RT, MT, PT and UT) for Bekapai BL/BA Platform |
Bekapai Field |
Completed Job |
| 102 |
March 2007 up to July 2008 |
PT. Total E&P Indonesia |
PT. NISCONI |
-. NDT Servicess (RT, MT, PT and UT) for 16 Well Connection at CPA Area |
CPA Field |
Completed Job |
| 101 |
February up to June 2007 |
PT. Total E&P Indonesia |
PT. NISCONI Handil |
-. NDT Servicess (RT, MT, PT and UT) for Switch Gear Project at CPA Area |
CPA Field |
Completed Job |
| 100 |
March up to June 2007 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil 0 |
-. Ultrasonic Test, Magnetic Particle Test and Dye Penetrant Test for Pipe line Repair MOL Senipah-Handil |
Senipah to Handil |
Completed Job |
| 99 |
March 2007 |
PT. Pertamina Balikpapan |
PT. Survindo Dwi Putra |
-. Ultrasonic Test, Magnetic Particle Test and Dye Penetrant Test for Reaktor 1 to 4 TA Project 2007 |
Pertamina Balikpapan |
Completed Job (Three weeks) |
| 98 |
March 2007 |
PT. H&H Utama International |
PT. H&H Utama International |
-. Radiography for Welder Test (Requalification for 40 Welder) |
HH Shop Batakan |
Completed Job (Three Days) |
| 97 |
February up to July 2007 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil 0 |
-. Ultrasonic Test, Magnetic Particle Test and Dye Penetrant Test for MOL Project |
Handil - Senipah |
Completed Job (6 Month) |
| 96 |
December 2006 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil 0 |
-. Magnetic Particle Test for Handil Camp Ext Project |
Handil - Senipah |
Completed Job (1 Week) |
| 95 |
November 2006 up to May 2007 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil 0 |
-. Ultrasonic Test for MOL Project |
Handil - Senipah |
Completed Job (5 month) |
| 94 |
November 2006 up to March 2007 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil 0 |
-. Ultrasonic Test for Tambora Riser Project |
Tambora Field |
Completed Job (3 month) |
| 93 |
September 2006 - at December 2007 |
PT. Total E&P Indonesia |
PT. NISCONI Handil |
-. NDT Servicess (RT, PT and UT) for BSP Construction Maintenance Back Log Batch#2 |
Peciko Field |
Completed Job (1 year) |
| 92 |
August 2006 |
PT. Elnusa (EWS) |
PT. Elnusa (EWS) |
-. Radiography Test for 25 Personnel of Welder Test |
Elnusa Shop - Batakan |
Completed Job (2 days) |
| 91 |
July 2006 - May 2007 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Handil |
-. NDT Servicess (RT, MT, PT and UT) for Backlock-Batch#1 Project at CPA |
CPA Field |
Completed Job |
| 90 |
June 2006 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Balikpapan |
-. Magnetic particle test for Construction of TNU North New Camp |
TUNU Field |
Completed Job (6 days) |
| 89 |
April 2006 |
PT. Total E&P Indonesia |
PT. Meindo Elang Indah - Balikpapan |
-. Magnetic particle test for Steel Structure Building Glycol - Tunu Project at Meindo Shop |
Batakan Balikpapan |
Completed Job (2 days) |
| 88 |
May 2006 up to June 2008 |
PT. Total E&P Indonesia |
PT. Paratech Gawi Manuntung - Handil |
-. NDT Servicess (RT, MT, PT and UT) for 30 Well Connection Project at CPU/NPU Area (2 years) |
CPU/NPU Kaltim |
Completed Job |
| 87 |
March 2006 to June 2007 |
PT. Total E&P Indonesia |
PT. NISCONI Handil |
-. NDT Servicess (RT, PT and UT) for PWC 2006-2007 (1 year). Note: PT. Survindotama Persada Joint operation with PT. Kwalita Inspectindo Dinamika. |
Peciko Field |
Completed Job |
| 86 |
March 2006 to February 2007 |
PT. Total E&P Indonesia |
PT. Perdana Karya Handil |
-. NDT Servicess (RT, MT, PT and UT) for 20 Well Connection Project at Handil/CPA Area (1 year) |
Handil/CPA Kaltim |
Completed Job |
| 85 |
2004 |
PT. Klaras Pusaka Instrumindo |
PT. Elputcika Persada |
-. Welding Procedure Specification (WPS)/Procedure Qualification Record (PQR) |
Jakarta |
Completed Job |
| |
|
|
|
-. Welder Certificate : 1 (one) Person |
|
|
| 84 |
2004 |
PT. Pertamina Areal Panas Bumi Kamojang |
PT. Pentasindo Perdana |
-. Radiography test for Pump Pipe Project |
Kamojang |
Completed Job |
| 83 |
2004 |
PT. Taman Impian Jaya Ancol |
PT. Taman Impian Jaya Ancol |
-. Radiography test and Ultrasonic Test for PGU Project Bagian Barat |
Jakarta |
Completed Job |
| 82 |
2004 |
PT. Pertamina UP.P.D.N VII Perigi Palu |
PT. Prima Sinar Suplindo |
-. Radiography test and Dye Penetrant Test for Process Piping |
Palu Sulawesi |
Completed Job |
| 81 |
2004 |
PT. Shoutern Tristar |
PT. Logistech Sapta Nugraha |
-. Radiography test of anode |
Jakarta |
Completed Job |
| 80 |
2004 |
PT. Perkasa Heavyindo Engineering |
PT. Sutindo Project Indonesia |
-. Supply man-power (QC) for Evaporator Project Pertamina Subang |
Subang Jawa Barat |
Completed Job |
| 79 |
2004 |
PT. Bina Wahana Petrindo |
PT. Lamindo Ekaperdana |
-. Radiography test for Tank |
Jakarta |
Completed Job |
| 78 |
2003 - 2004 |
PT. Akar Golindo |
PT. Elputcika Persada |
-. Welder Certificate : 2 Person |
Jakarta |
Completed Job |
| |
|
|
|
-. Welding Procedure Specification (WPS)/Procedure Qualification Record (PQR) |
|
|
| 77 |
2003 - 2004 |
PT. Pertamina Cilacap |
PT. Iridian Surya Wahana |
-. Radiography test for Proces Piping |
Cilacap |
Completed Job |
| 76 |
2003 - 2004 |
PT. Pertamina EP II Dumai |
PT. Sentra Mekanindo |
-. Radiography test for Heat Exchanger |
Dumai Sumatra |
Completed Job |
| 75 |
2003 - 2004 |
PT. Tanla Tescor Welindo |
PT. Istaka Karya |
-. Welder Certificate : 5 Person |
Jakarta |
Completed Job |
| |
|
|
|
-. Welding Procedure Specification (WPS)/Procedure Qualification Record (PQR) |
|
|
| |
|
|
|
-. Radiography test for Girder |
|
|
| 74 |
2003 - 2004 |
PT. Wood Group |
PT. Depriwangga |
-. Magnetic Particle Test |
Jakarta |
Completed Job |
| 73 |
2003 - 2004 |
PT. Hot-Had Belanak |
PT. Depriwangga |
-. Magnetic Particle Test |
Jakarta |
Completed Job |
| 72 |
2003 - 2004 |
PT. Iridian Surya Wahana |
- |
-. Supply team radiography for project PLTU |
Muara Karang |
Completed Job |
| 71 |
2003 - 2004 |
PT. Tanla Tescor Welindo |
PT. Istaka Karya |
-. Welder Certificate : 5 Person |
Jakarta |
Completed Job |
| 70 |
2003 - 2004 |
PT. Tifico |
PT. Sentra Mekanindo |
-. Radiography test for storage tank |
Jakarta |
Completed Job |
| 69 |
2002 - 2003 |
PT. Yusditira Haka Perkasa |
PT. Yusditira Haka Perkasa |
-. Prepare WPS / PQR : 4 (four) WPS/PQR |
Cilamaya Jawa Barat |
Completed Job |
| |
|
|
|
-. Welder Qualification test : 10 (ten) Welder Certificate |
|
|
| |
|
|
|
-. Radiography test : Mini plant LPG |
|
|
| 68 |
2002 - 2003 |
PT. Hot-Had Belanak |
PT. Depriwangga |
-. MPI test |
Belanak |
Completed Job |
| 67 |
2002 - 2003 |
PT. Unocal Indonesia |
PT. Depriwangga |
-. Radiography test and Ultrasonic Test for Shut-down condition at Sepinggan/Tj. Santan |
Balikpapan Kaltim |
Completed Job |
| 66 |
2002 - 2003 |
PT. Multi Dinamika Sarana Engineering |
PT. Multicon Dinamika Sarana Engineering |
-. Radiography test and Dye Penetrant Test for Storage Tank |
Cilamaya |
Completed Job |
| 65 |
2002 - 2003 |
Energy Equity |
Energy Equity |
-. Welding Inspector for Pipeline at Sengkang, Wajo |
Wajo Sulsel |
Completed Job |
| |
|
|
|
-. Radiography test and Holiday Test for E 8" Gas Pipeline |
|
|
| 64 |
2002 - 2003 |
PT. Unocal Indonesia |
PT. Survindotama Persada - Balikpapan |
-. Radiography test E 20" Pipeline at Tj. Santan |
Kaltim |
Completed Job |
| 63 |
2002 - 2003 |
Pertamina UP. VI Balongan |
PT. Elka Indonesia Jaya |
-. Radiography test Process Piping and Services Tank |
Balongan |
Completed Job |
| 62 |
2002 - 2003 |
Mc. Dermott Indonesia |
PT. OIS & PT. Fajar Mas Murni |
-. Radiography test Process Piping, Jacket, Leg, Deck |
Batam |
Completed Job |
| 61 |
2002 - 2003 |
Proyek Gas Negara (PGN) |
PT. Rekayasa Industri |
-. Welder Qualification Test : 24 Welder Certificate |
Jakarta |
Completed Job |
| 60 |
2002 - 2003 |
PT. Pertamina EP. Cirebon |
- |
-. Radiography test E 4" Pipiline |
Subang Jawa Barat |
Completed Job |
| 59 |
2002 - 2003 |
PT. Total Indonesia |
PT. Sucofindo |
-. Radiography test Process Piping at PT. SKJ - TUNU Yard |
Tunu Kaltim |
Completed Job |
| 58 |
2002 - 2003 |
PT. Total Indonesia |
PT. Gunanusa |
-. Radiography test Process Piping, Jacket, Deck, Pressure Vessel |
Merak Gunanusa Yard |
Completed Job |
| 57 |
2002 - 2003 |
PT. Pertamina Panas Bumi Dieng |
PT. Gerbang Sarana Baja |
-. Prepared WPS / PQR : 3 (three) Ea |
Jawa Tenhgah |
Completed Job |
| |
|
|
|
-. Welder Qualification Test: 8 (eight) Welder Certificate |
|
|
| |
|
|
|
-. Radiography test for Scrubber 9 Mtr. |
|
|
| 56 |
2002 - 2003 |
PT. Pertamina UP. VI Balongan |
CV. Artha Utama & CV. Karya Prima |
-. Radiography test for Process Piping TUBE ECONOMIZER project TE 13F, 101 (COC) |
Balongan |
Completed Job |
| 55 |
2001 |
Job - Gulf Jambi |
PT. Citra Panji Manunggal |
-. Radiography test for Piping Block Station Joint - operation with PT. Hasta Swa Usaha Karya |
Jambi Sumatra |
Completed Job |
| 54 |
2001 |
PT. Pertamina EP.D.O - Hulu Cirebon |
PT. Djasa Uber Sakti Cilamaya |
-. Radiography test and Dye Penetrant Test for Modification Suction Manifold |
Cilamaya |
Completed Job |
| 53 |
2001 |
PT. Pertamina UP.P.D.N III Balongan |
PT. Pertamina UP.P.D.N III Balaongan |
-. Re-certification 1 unit of Pressure vessel joint operation with BKI |
Balongan |
Completed Job |
| 52 |
2001 |
PT. Pertamina UP. VI Balongan |
CV. Dwi Perkasa |
-. Radiography test for Piping Turn Arround Servicess LPG |
Mundu Balongan |
Completed Job |
| 51 |
2001 |
PT. Murinda Metal Work |
PT. Murinda Metal Work |
-. Radiography test for Girder of Overhead Crane - Total Indonesia |
Bekasi |
Completed Job |
| 50 |
2001 |
PT. Pertamina UP. VI Balongan |
PT. Teguh Perkasa |
-. Radiography test for Piping Turn Arround Servicess |
Balongan |
Completed Job |
| 49 |
2001 |
PT. Pertamina UP. VI Balongan |
PT. Inkanindo & PT. JKB Indramayu |
-. Radiography test for repair catalist cooler 15E - 113C |
Balongan |
Completed Job |
| 48 |
2000 |
PT. Gas Negara (PGN) |
PT. Agnes Jaya |
-. Radiography test for E 8" Gas Pipeline |
Cikampek Jawa Barat |
Completed Job |
| 47 |
2000 |
PT. Unocal Gunung Salak |
PT. Fajar Gemilang Semesta |
-. Prepare WPS / PQR |
Cikarang |
Completed Job |
| |
|
|
|
-. Radiography test 3 units of Pressure Vessel |
|
|
| |
|
|
|
-. Hydrostatic test 3 units of Pressure Vessel |
|
|
| 46 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Permata Balongan |
-. Radiography test for E 4" Trunk Line (53 Joints) at Limbangan |
Indramayu |
Completed Job |
| 45 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Betasurya Pratama |
-. Radiography test Process Piping for Utility Plant |
Balongan |
Completed Job |
| 44 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Usaha Optima Persada |
-. Radiography test for Process Piping RCC Plant |
Balongan |
Completed Job |
| 43 |
2000 |
PT. Petro Widada |
PT. Promits Engineering |
-. Radiography test of Process Piping for Chemical Plant |
Gresik Jawa Timur |
Completed Job |
| |
|
|
|
-. Preparation Welding Procedure and Welder Qualification Test |
|
|
| 42 |
2000 |
PT. Total Indonesia |
PT. Murinda Iron Steel |
-. Radiography test of Girder for Overhead Crane - Total Indonesia |
Jakarta |
Completed Job |
| 41 |
2000 |
PT. Total Indonesia |
PT. Citra Panji Manunggal |
-. Radiography test for Pipeline |
Handil Kaltim |
Completed Job |
| 40 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Inkanindo Indramayu |
-. Radiography test and Dye Penetrant Test for Maintenance Process Piping |
Indramayu |
Completed Job |
| 39 |
2000 |
PT. PLN |
PT. Batara Kujang Prima |
-. Radiography test for Girder |
Cileungsi Jawa Barat |
Completed Job |
| 38 |
2000 |
PT. Promits Engineering |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT, and PT) for E 110" Storage Tank |
Depok |
Completed Job |
| 37 |
2000 |
PT. Muladi |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT, PT and UT) for E 36" & 24" Pig Launcher and Receiver |
Depok |
Completed Job |
| 36 |
2000 |
PT. U.I.C - Merak |
PT. Sentra Mekanindo |
-. Radiography test for Pipe Header |
Merak Jawa Barat |
Completed Job |
| 35 |
2000 |
PT. Total Indonesia |
PT. Iridian Jakarta |
-. Supply Radiography Team for Pipeline Project |
Handil Kaltim |
Completed Job |
| 34 |
2000 |
PT. Multifab Cilegon |
PT. Multifab Cilegon |
-. Radiography test for Pressure Vessel & Piping |
Cilegon |
Completed Job |
| 33 |
2000 |
PT. Raga Perkasa Ekaguna |
PT. Sentra Mekanindo |
-. Radiography test of 3 units Several Tank |
Depok |
Completed Job |
| 32 |
2000 |
PT. Pertamina Kaltim |
PT. Cokro Jakarta |
-. Prepared WPS / PQR |
Jakarta |
Completed Job |
| 31 |
2000 |
PT. Total Indonesia |
PT. Hasta Swaka Jakarta |
-. Supply Radiography Team for Pipeline Project |
Handil Kaltim |
Completed Job |
| 30 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Inkanindo Indramayu |
-. Radiographic test for Piping Maintenance |
Balongan |
Completed Job |
| 29 |
2000 |
PT. Pertamina UP. VI Balongan |
PT. Pertamina UP. VI Balongan |
-. Radiographic test and Dye Penetrant Test for Piping Maintenance |
Balongan |
Completed Job |
| 28 |
1998 - 1999 |
PT. Pertamina UP. VI Balongan |
PT. Inkanindo Indramayu |
-. Radiographic test for Piping Maintenance |
Balongan |
Completed Job |
| 27 |
1998 - 1999 |
PT. Pertamina Jambi |
PT. Lamindo Jakarata |
-. Radiographic test for Pipeline E 4" (4000 m) crude oil |
Jambi Sumatra |
Completed Job |
| 26 |
1998 - 1999 |
PT. Pertamina Cilamaya |
PT. Natindo - Sendiko Konsorsium |
-. Radiographic test for Process Piping |
Cilamaya Jawa Barat |
Completed Job |
| 25 |
1998 - 1999 |
PT. Total Indonesia |
PT. Citra Indonesia |
-. Film Interpreter as reff PT. Citra Indonesia |
Balikpapan Kaltim |
Completed Job |
| 24 |
1998 - 1999 |
PT. Pertamina UPPDN II Jakarta |
PT. Bina Buana Nugraha |
-. Radiographic test for Storage Tank as per ASME VIII |
Lampung Sumatra |
Completed Job |
| 23 |
1998 - 1999 |
PT. Bukaka |
PT. Sentra Mekanindo |
-. Radiographic test for Storage Tank and Process Piping |
Depok |
Completed Job |
| 22 |
1998 - 1999 |
PT. Pertamina Karang Ampel |
PT. Sendiko Dongbu Natindo - Jakarta |
-. Radiographic test for Process Piping of CO2 Removal Cilamaya Utara |
Karang Ampel |
Completed Job |
| 21 |
1996 - 1997 |
PT. Nigata |
PT. Multifab |
-. Radiographic test for Several Tank |
Cilegon |
Completed Job |
| 20 |
1996 - 1997 |
PT. Pertamina Cilacap |
PT. Sucofindo Cilacap |
-. NDT Servicess (RT, MT and PT) for maintenance of process piping |
Cilacap |
Completed Job |
| 19 |
1996 - 1997 |
PT. Vico Indonesia |
PT. Hasta Swaka |
-. Radiographic test for Gas Pipeline at Sanga-sanga |
Kaltim |
Completed Job |
| 18 |
1996 - 1997 |
PT. Total Indonesia |
PT. Sucofindo Samarinda |
-. Radiographic test for Gas Pipeline |
Kaltim |
Completed Job |
| 17 |
1996 - 1997 |
Perum Gas Negara |
PT. Karya Inter Kencana |
-. Radiographic test for Gas Pipeline and Process Piping |
Cibitung Jawa Barat |
Completed Job |
| 16 |
1996 - 1997 |
PT. Hoechst |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT and PT) for Storage Tank |
Depok |
Completed Job |
| 15 |
1996 - 1997 |
PT. Artawa Indonesia |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT and PT) for Storage Tank |
Depok |
Completed Job |
| 14 |
1996 - 1997 |
PT. Pertamina Cirebon |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT, PT and UT) for Pressure Vessel |
Depok |
Completed Job |
| 13 |
1996 - 1997 |
PT. South Pacific |
PT. Aalborg Sunrod Indonesia |
-. NDT Servicess (RT, MT, PT and UT) for Boiler and Pressure Vessel |
Purwakarta Jawa Barat |
Completed Job |
| 12 |
1996 - 1997 |
IKPT - Bukit Muria Nestle |
PT. Aalborg Sunrod Indonesia |
-. NDT Servicess (RT, MT, PT and UT) for Boiler and Pressure Vessel |
Jakarta |
Completed Job |
| 11 |
1996 - 1997 |
PT. Santa Fee-Indonesis |
PT. Sentra Mekanindo |
-. NDT Servicess (RT, MT, PT and UT) for several Pressure Vessel |
Depok |
Completed Job |
| |
|
|
|
-. NDT Servicess (RT, MT, PT and UT) for Pig launcher, Pig Receiver and process piping |
|
|
| 10 |
1996 - 1997 |
PT. Eterindo - Petro Octanol Plant |
PT. Promits Engineering |
-. NDT Servicess (RT, MT, PT and UT) Process Piping for Chemical Plant |
Gresik Jawa Timur |
Completed Job |
| |
|
|
|
-. Preparation Welding Procedure and Welder Qualification Test approved by MIGAS |
|
|
| 9 |
1996 - 1997 |
PT. Asahi Subentra |
PT. Promits Engineering |
-. Radiographic test for 4 unit several tanks, storage tank E 40 m AVP Phase III-2 |
Anyer Jawa Barat |
Completed Job |
| |
|
|
|
-. Welder Qualification Test and Welder Certification approved by Depnaker |
|
|
| |
|
|
|
-. Radiographic test Process Piping PVC Revamping Project |
|
|
| 8 |
1996 - 1997 |
PT. Artawa Indonesia |
PT. Sentra Mekanindo |
-. Welder Qualification Test and Welder certification approved by Depnaker |
Depok |
Completed Job |
| 7 |
1996 - 1997 |
PT. Ansaldo, KMT TSR |
PT. Bukaka Kujang Prima |
-. Radiographic test Several Pressure Vessel E 2 m and 4 m units Sparator E 18" |
Depok |
Completed Job |
| 6 |
1996 - 1997 |
PT. Unocal Balikpapan |
PT. Sentra Mekanindo |
-. Preparation WPS as per ASME IX and Welder Certification by MIGAS |
Cikampek |
Completed Job |
| |
|
|
|
-. Radiographic test I unit pressure vessel at work shop PT. Bukaka Kujang Prima |
|
|
| 5 |
1996 - 1997 |
PT. Asahi Subentra |
PT. Promits Engineering |
-. Radiographic test and Dye Penetrant test of Process Piping Chemical Plant |
Anyer Jawa Barat |
Completed Job |
| 4 |
1996 - 1997 |
Pertamina O.E.P Karang Ampel |
PT. Sendiko Dongbu Natindo - Jakarta |
-. Radiographic test E 3" and 4" Gas Pipeline (11 Km) |
Cilamaya Utara |
Completed Job |
| 3 |
1996 |
Perum Gas Negara |
PT. Buana Langgeng Abadi |
-. Radiographic test 2000 m E 4" at PT. Polyglass |
Tangerang |
Completed Job |
| 3 |
1996 |
Perum Gas Negara |
PT. Buana Langgeng Abadi |
-. Radiographic test 2000 m E 4" at PT. Polyglass |
Tangerang |
Completed Job |
| |
|
|
|
-. Radiographic test 800 m E 4" at PT. Sinar Rapi Asri |
Tangerang |
|
| |
|
|
|
-. Radiographic test 500 m E 4" at Rumah Susun Bidara Cina |
Jakarta |
|
| |
|
|
|
-. Welder Qualification Test for Hot Tapping |
Jakarta |
|
| |
|
|
|
-. Prepare WPS as per API 1104 and ASME Sec. IX |
Jakarta |
|
| 2 |
1996 |
Pertamina - UPPDN III |
PT. Buana Langgeng Abadi |
-. Radiographic test E 2" & E 4" Gas Pipe Line for Installation Fuel Gas Station at Jl. Sumenep, Jl. Pluit Raya, Jl. Pemuda, Jl. Raya Bekasi, Jl. Buncit Raya and Jl. Raya Kelapa Gading |
Jakarta |
Completed Job |
| 1 |
1996 |
Perum Gas Negara |
PT. Suggiron |
-. Prepared WPS as per API 1104 |
Jakarta |
Completed Job |
| |
|
|
|
|
|
|